Construction companies of wooden houses with a boiler room. Projects of houses with a boiler room

Timber houses with a boiler house are created for winter use. The presence of a special furnace room indicates that this good project, specially prepared for year-round use.

The boiler room can be located in one-storey cottage and on the ground floor. It depends on the wishes of the customer, the chosen project and the preferred heating system.

Where should the boiler room be located?

In most layouts of country cottages, the furnace is located on the ground floor. This is due to the fact that the lion's share of thermal heating schemes implies a reinforced circuit on the ground floor. The second floor is heated not so intensively, and often completely devoid of heating.

A properly designed boiler room must meet all technical requirements, and be responsible not only for heating, but also for heating water.

Often a bathroom and a bathroom are placed near the furnace room to provide a strong water pressure.

What should be placed in the boiler room?

When ordering a turnkey construction, you need to understand what units and devices should be in the furnace. The optimal list looks like this:

  • Boilers.

They can work on coal, gas, wood briquettes and biofuels. For heating a cottage made of profiled timber, both mono-boilers (run on the same type of fuel) and combined solutions are suitable. They are able to process several different energy sources.

  • Devices for heating running water.

Usually these are electric boilers. less often geysers different power.

  • Water tank.

A large tank in which heated water accumulates. Usually its capacity does not exceed 150-200 liters. This is enough for 2-3 people during the day. Water in such a container can remain hot for a long time.

In addition, filters for coarse water purification, hydraulic separators, various pipe piping elements, shut-off valves and electrical panel.

Wooden housing construction, thanks to the development of wood processing technology, which gives this material additional design capabilities, currently occupies a large share in the field of private housing construction. Wood is not only the most environmentally friendly material, it perfectly retains heat, maintains a healthy microclimate in the house. A house built by North Forest from or is perfect for permanent residence.
For year-round living wooden house it must be equipped with a reliable heating system. To accommodate the heating boiler, its piping system, water treatment system, it is more convenient to allocate a separate room. Therefore, for permanent residence, we usually order a house with a boiler room. And if you are planning gas heating, then the boiler room in the house must meet the requirements fire safety to: the dimensions of the room, the dimensions of the glazing, the ventilation system, a separate exit to the street, etc. Projects wooden houses from the boiler room created by our experts meet the requirements of SNiP and other regulatory documents. Each project is carefully thought out: from the study of layouts and facades to the arrangement of furniture. Almost all house projects presented on our website have a boiler room. At the request of the customer, we will change the layout free of charge.

Features of houses with a boiler room

  • 1. If possible, the boiler room is located next to the kitchen, with a gas stove installation site. This allows you to make only one entry of the gas pipe into the house. For ease of laying engineering networks they try to locate bathrooms as close as possible to the boiler room.
  • 2. Even if, according to fire safety requirements, there is access to the street from the boiler room, very often they make the door to the boiler room from the house. Thus, you can get into the boiler room without going outside. Maintenance of the boiler, replacement of filters, setting a comfortable air temperature become much more convenient.
  • 3. In small houses in the boiler room, in addition to equipment, they put washing machine and clothes dryer.
  • 4. The location of the boiler house inside the house is much more economical and convenient than in the basement. Fire safety requirements for placing a boiler room in the basement are more stringent than in the house.

If you liked the project of a small house without a boiler room, we will finalize this project and design a boiler room in the house that meets all fire standards. North Forest has been building wooden houses for over 15 years. We have designed and built almost

Efficient heating is one of the most important characteristics of any home, so the company " Summer Seasonยป is ready to offer services for the design and construction of houses with a boiler room. Our experts are ready to provide you with housing where you can independently regulate the temperature depending on the weather.

Features of houses with a boiler room

The main feature of the house with a boiler room is the presence of a separate room designed to accommodate boiler equipment. At the same time, the room itself is designed taking into account certain requirements established normative documents. Otherwise, the layout of the house with a boiler room is no different from ordinary residential cottages. It also has living rooms, a kitchen, a bathroom and other premises.

The presence of a boiler room in a private house gives a number of advantages to its owner:

  • Simple maintenance and repair of boiler equipment
  • The ability to independently regulate the temperature in the house
  • Easy access to all boiler equipment controls

It is also worth noting that a boiler room attached to the house or brought to a separate room provides a higher level of security than when the boiler and other equipment are located directly in the basement or on the basement floor.

Houses with a boiler house from the company "Dachny Sezon"

The company "Dachny Season" offers services for the design and construction of houses with a boiler room. Turning to us, you get the following benefits:

  • We carry out the construction of turnkey houses
  • All houses come with a 10 year warranty.
  • Our experts are ready to carry out redevelopment absolutely free of charge
  • All types of work are carried out by the company itself
  • Our prices are lower than those of competitors in Moscow and the Moscow region

We are ready to develop for you a project of a house with a boiler room, which will take into account all your wishes, as well as the standards established for such structures.

The Russkaya Postroechka company manufactures and inexpensively builds turnkey houses from a bar with a boiler house in the Central and North-West region of the Russian Federation. These are functional and practical one-, two-story buildings made of environmentally friendly, natural material. The presented catalog contains 4 projects of houses with a boiler room.

Standard projects, implemented more than once in practice, allow you to accurately calculate construction costs and quickly get the finished result. If necessary, minor adjustments can be made to the finished project in order to adapt it to the individual requirements of the customer.

We offer our customers to buy a house from a bar of natural moisture (for shrinkage) or chamber drying. In the first case, you can additionally save up to 20% of the cost of the house, in the second - to build a house, immediately ready for use. We have our own woodworking production, so the price of the material is affordable for most people.

Profiled timber is delivered directly to the construction site. The form of payment is convenient for customers: 70% of the total price is paid after the delivery of the material, 30% - upon completion construction works and putting the facility into operation.

Advantages of houses with a boiler room

Projects of houses from a bar with a boiler room are chosen by those customers who appreciate usable space and want to use it as rationally as possible. Building a house with a boiler room has a number of advantages.

  1. The price of such a multifunctional structure is much lower than the cost of building a house and a boiler room separately.
  2. It is easier and easier to maintain the equipment of the boiler room, especially in the winter season, if the room is adjacent directly to the residential block.
  3. Due to the ergonomic design of the building, you can free up the space of the local area and use it for other purposes.

The Russian Postroechka company has been on the domestic market for more than 5 years. We are trusted by customers, and we guarantee the quality of both material and construction work. You can get advice and additional information about cooperation from our specialists by phone toll-free. We are ready to start construction without delay!

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, a decision was made to relocate the terrace.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grillage foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: the walls are insulated with basalt facade insulation and plastered, the finishing elements are made of wood, made on site, based on TK-visualization, painted. Plinth laid out decorative stone.
    interior decoration: decoration was carried out according to the design project, where the combination was taken as the basis decorative plaster with stone and wood. False beams were mounted on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with finished Project your future home! Our team liked the project - after all, such unusual and stylish solutions it's always a professional challenge!
    We prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made in our proven Canadian technology with 200 mm insulation around the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to the professional coloring of imitation timber and the selection of colors.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an existing foundation, or buildings on the site, extensions to already standing buildings and much more! For the Matsuev family, this was exactly not an easy task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be built in short term on the existing foundation. Dmitry and his family had a desire to build new house in hi-tech style. After careful measurements, a project was made that took into account the old layout, but had a new one. modern form with exciting news! The house has appeared entry group, where you can sit at a table in cozy evenings and a complex but possible exploited roof in our lane. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, welded roofing and more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth stucco walls with painted planken details add personality to the wooden beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the country architecture section in high-tech style, in the style chosen by bold Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home to live in, which will fit perfectly into their difficult narrow lot! With the advent of children, it was decided to realize the dream, children grow up quickly and in their own house in nature there are many opportunities and Fresh air. We, in turn, were happy to work on an individual project at home in classical style from red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, store materials on the site, get acquainted with the construction team, make sure the quality of work. After visiting the facility, Olga decided to work with us! And we were happy to do our favorite work again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    ceilings: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, mortar masonry??? Windows inserted.
    roofing: metal tile
    terrace: rough enclosing elements are made, flooring is done.

    What was done

    Dmitry approached our company with an interesting draft design to calculate the cost. Our experience allows us to perform such calculations according to draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from among many of our colleagues in the shop to complete the project. Our team has embarked on a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the delivery of the project, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roofing. Also, the exact timing of construction was important for Dmitry, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was handed over right on time! The result pleased us and the Customer. All stages of work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans installation of LVL beams. The basement is insulated with 200mm basalt insulation; interfloor overlap with sound insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, mortar masonry. Windows inserted.
    roofing: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; color solution proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    From the idea to its implementation, Olga and other family members went through several stages! The choice of technology, a long work on the project, the construction of the foundation, the construction of a house with exterior finishes and then work on interior decoration! The frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work at our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their cost. This made it possible to choose best option from a wide variety finishing materials and kits.
    The project was created by an architect friend, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - UWB. Then work began on the box. A frame house with 200 mm insulation along the entire contour and a unique 300 mm roof insulation technology. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are placed thanks to the powerful roof overhangs, interfloor belt and large windows!

    What was done

    When you decide to become a happy owner own house and move to a new house for permanent residence, first of all you think about what kind of house it will be; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in the winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with exterior decoration by spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were satisfied with our work. This is an individually designed Avignon project, realized in stone technology with external insulation and siding trim!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house good people and they recommended us to another good man! Rumyantsev Andrey came to our company with a desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house ... It was decided to build the house from aerated concrete blocks so that the future country handsome man would please the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies we have stepped forward so much that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and a patio were proposed, taking into account the cardinal directions on the Customer's site.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a sound insulation device of 150 mm.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels were added under the Tolento stone. The enclosing elements of the terrace, balcony made of wood, made on site, based on the TK-visualization, painted. Roof overhangs are hemmed with spotlights in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "brought to life according to his idea and sketch!"

    House options:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot with picturesque views of the Oka River! Such a view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, focused on beauty, became an indispensable attribute of the future home! Vladimir wanted to relax in nature in a wooden house, and it was necessary to build a house in a short time and the ideal solution for such tasks was frame technology construction! If we are different, then in everything! The house was made even more spectacular by the vertical finish with an imitation of durable larch timber, painted in natural shades with an accentuated wood texture. Complement the modern look of the house - windows with lamination! It turned out to be an excellent country house, with zest and at the same time incredibly functional.

    It all started with an individual project found by the Customer's family on a European website. It was with him that she came to our office for the first time. We have done preliminary calculations on the project, gave a tour of the existing construction site, shook hands and the work began to boil! The architect improved and adapted the project to the site and the Customer's family; the foreman "planted" the house on the site. Based on the fact of geological surveys, it was decided to put the house on bored piles. The frame has grown in a few weeks, then the roof, insulation, exterior finish! During the winter, a house grew on the site. The customer invited a third-party technical supervisor who monitored the process regardless of our multi-stage control. The color scheme for painting the imitation of timber was chosen by our manager and here we have a bright and cozy dream country house of the Pushkov family!